WHICH PROJECTS HAVE WE COMPLETED?

Making a Difference Projects

Smart Drawer System
AYRINTILAR
Smart Drawer System
Completed Projects

T3 Smart Drawer

It has 6 drawers, has special software and provides stock management within the production area.

Transporting and Stacking Disinfectants

Our system was integrated with the client’s SAP system, allowing it to operate according to the job orders received from SAP. The following components were used:

  • 2 pcs Kuka brand 6-axis robots
  • 1 pcs Siemens S7-1514 PLC
  • 2 pcs Servo Attachment
  • SAP Integration

Transporting and Stacking Disinfectants

Transporting and Stacking Disinfectants
AYRINTILAR
Transporting and Stacking Disinfectants
Completed Projects

AVES

AVES
AYRINTILAR
AVES
Completed Projects

Aves Automatic Filling Plant

An automatic palletizing system has been integrated into the continuation of the automatic filling facility. In the project;
  • 2 palletizers (palletizer-stretching machine)
  • 3 robots and one elevator for floor transition
  • 7 pieces S7-1500 PLC
  • 7 pieces of TP1200HMI

used.

PICK TO LIGHT PROJECT (Pick to Open)

  • 18 specially designed electromechanical covers
  • Panasonic PLC
  • 18 Pieces of Curtain Type Optical Pick to Light Sensor

HYUNDAI PICK TO LIGHT PROJECT (PICK TO OPEN)

HYUNDAI PICK TO LIGHT PROJECT (PICK TO OPEN)
AYRINTILAR
HYUNDAI PICK TO LIGHT PROJECT (PICK TO OPEN)
Completed Projects

YILMAZ REDUKTOR INSTALLATION AND DYEING LINES

Yılmaz Gearbox Project
AYRINTILAR
Yılmaz Gearbox Project
Completed Projects

Yılmaz Reducer Assembly and Paint Shop Lines

  • 180 pcs drivers
  • ModBus Communication with Drivers.
  • 4 PLC and MCC panels.
  • 10 HMI
  • Yılmaz Reductor’s own brand PLC and Drivers.

Etibakır Cerattepe Copper Mine Underground Automation

  • 16 long-distance RfId readers.
  • RS485 communication between RfId reader and PLC
  • Profibus communication between 7 PLCs and PLCs.
  • WiinCC V14 SCADA
  • Ethernet communication over long distance copper cable between SCADA and PLC.
  • 12 fixed gas detectors, 2 measuring points.
  • 10 traffic signaling points.
  • 5 high-power ventilation fans.
  • Airflow velocity measurement at 2 points
  • 1 compressed air compressor.
  • 1 hydraulically driven ventilation door.
  • 1 Piece Stench gas warning system.

ETIBAKIR CERATTEPE UNDERGROUND AUTOMATION

Eti Bakır Underground Mining Automation Project
AYRINTILAR
Eti Bakır Underground Mining Automation Project
Completed Projects

ÇAMSAN END OF LINE APPLICATION PROJECT

End of Line Application Project
AYRINTILAR
End of Line Application Project
Completed Projects

End of Line Application Project

  • Siemens S7 1512 PLC
  • Siemens TP 1500 15” Touchscreen HMI
  • Murr IO-Link Sensor islands
  • 25 Siemens G Series Drivers
  • Profinet communication with drive and sensor islands
  • Drum Opening, Winding, Many position control applications.

Nursan Pick To Light Project

  • 3 separate shelving systems
  • 150 optical pick to light sensors
  • Mod Bus TCP interface remote input / output modules.
  • T3 Light; Special pick to light software integrated into the company server.
  • Turnkey project including assembly, cabling, commissioning.

NURSAN PICK TO LIGHT PROJECT

NURSAN PICK TO LIGHT PROJECT
AYRINTILAR
NURSAN PICK TO LIGHT PROJECT
Completed Projects

Gelişmelerden haberdar ol.

Sektörel gelişmelerden ve yeniliklerden haberdar olmak için e-posta adresinizi bırakabilirsiniz.
close-link